Factors Influencing Cost Overrun and Delay with Their Risks in Construction Management

Gowtham Kishor Kumar B; P. Palson

Sponsor(s)
Blue Eyes Intelligence Engineering and Sciences Publication(BEIESP)

Cost overrun and delay are the most important factors which affect the rate of progress in construction industries. There are numerous Risks are involved in cost and schedule overrun which leads to unprofitable situation or dropping the project. Previous literature studies are mainly focused only on cost overrun and delay but they do not deal with their risks which is important to study. This study is to assess the factors influencing time and cost overruns on construction projects and their risks also. The objectives of the study were achieved through valid questionnaire. The questionnaires are collected over 40 construction companies. From this survey, identify and ranking the various elements which are responsible for the inflation of cost and schedule overrun using analytical software like SPSS. And discuss about the significant values obtained from the collecting data and recommendation and mitigation ideas from the ranking of overrun factors. The significant value should be more than 0.05 and from our analysis most of the factors are above that value. The study clarified that incorrect estimates and low productivity level of labors highly contributes to overrun in construction management. It will leads to unprofitable situation, so proper scheduling and better management will rectify these problems.

Files (494.8 kB)
Name Size
C4549099320.pdf
md5:7faba768bf70f7bc5bf6d1cab1059fcf
494.8 kB Download
51
34
views
downloads
Views 51
Downloads 34
Data volume 16.8 MB
Unique views 43
Unique downloads 31

Share

Cite as