Published December 21, 2021 | Version v1

Workflow Extensions Milestone 4.2 - MS9

Description

The milestone target was to report on the delivery of software to deliver tight integration between the scheduler (CYLC) and the I/O middleware (ESDM) so as to support maximally efficient use of storage resources during pre-exascale workflows. However, as the work was being done, analysis showed that the benefits available at this time of carrying out the planned tight integration would not warrant completing all the software development; we believe the existing level of integration with the scheduler running code which includes storage configuration delivers on the underlying requirements. Accordingly, we mark the milestone complete (the underlying requirement has been met), and have redeployed resource yielded by not completing the tight integration software on other aspects of WP4.

Files

MS9-ESiWACE2.pdf

Files (62.8 kB)

Name Size
md5:97aebd462bd543018e6e8e6c8e8670d8
62.8 kB Preview Download

Additional details

Funding

European Commission
ESiWACE2 - Excellence in Simulation of Weather and Climate in Europe, Phase 2 823988