Info: Zenodo’s user support line is staffed on regular business days between Dec 23 and Jan 5. Response times may be slightly longer than normal.

Published November 11, 2019 | Version v1
Journal article Open

Design and Implementation of a Real-Time Monitoring System for the Parameters of Electro-Electric Variables of the Electric Power Control and Backup Equipment of the ECU 911 Loja Integrated Security System

  • 1. National University of Loja

Description

The purpose of this research is to develop a real-time monitoring system that allows visualizing the electro-energetic parameters of the internal electrical network of the building of the Integrated Security System ECU 911 Loja. The electrical system of the SIS ECU 911 Loja, is currently integrated with electric power control and backup equipment, which is in charge of the supervision and control of said system. The proposal of this article, has to develop a software that allows to accede to the electroenergetic variables measured by these equipment, through a human-machine interface or HMI. It begins with a brief study of the monitoring and control systems used in the industry, better known as SCADA systems. Then, it proceeds to the collection of information from the work field, as well as the equipment that intervenes in it. Finally, using free software tools, which are detailed in the writing, the monitoring system is designed and implemented.

Files

vol6n2p7.pdf

Files (8.4 MB)

Name Size Download all
md5:bdcfa0bffac4c9599ba00ab874c1d15c
8.4 MB Preview Download

Additional details

Related works

Is referenced by
Journal article: https://lajc.epn.edu.ec/index.php/LAJC/article/view/171 (URL)