Classification of Evaluation Metrics for Project Baseline Schedules

  • 1. Department of Construction and Building Engineering, Arab Academy of Science and Technology, Cairo, Egypt.
  • 2. Construction Engineering Department, Zagazig University, (Currently at The British University in Egypt)., Cairo, Egypt
  • 1. Publisher

Description

The Evaluation of construction baseline schedules aims to provide a high-quality project schedule. However, obtaining a project schedule free from technical defects remains a challenge to construction planners and schedulers.The result of having a high-quality schedule is achieving the desired project completion dates and avoid any disputes between the construction project parties which may be present due to the technical defects of the schedule itself. Many organizations and consultants had developed some evaluations techniques for assessing the baseline schedules from different prospects. The aim of this study is to classify and filter out the evaluation metrics and parameters of the project baseline schedule, in order to facilitate the schedule reviewing and evaluating process. This is achieved by introducing a clear, arranged and classified evaluation metrics to let the schedule reviewerto list down all the schedule technical defects and convert them into clear comments in order to rectify them and having a schedule free of defects.

Files

C5456029320.pdf

Files (446.4 kB)

Name Size Download all
md5:51dbecf540ec52efe516eb421ca58867
446.4 kB Preview Download

Additional details

Related works

Is cited by
Journal article: 2249-8958 (ISSN)

Subjects

ISSN
2249-8958
Retrieval Number
100.1/ijeat.C5456029320