Estimation of Rate and Time Delay for underground Mumbai Metro Corridor by using Monte Carlo Simulation
- 1. Department of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Panvel, Maharashtra, India.
- 2. Department of Faculty of Civil Engineering, Pillai HOC College of Engineering and Technology, Rasayani, Panvel, Maharashtra, India.
- 3. Department of Faculty of Civil Engineering. Pillai HOC College of Engineering and Technology, Rasayani, Panvel, Maharashtra, India.
Contributors
- 1. Publisher
Description
Globally the utilization of metros is incredibly common for transportation for convey individuals at one place to a different for convey individuals at one place to a different with ease. Infrastructure os Asian nation project ill-framed for time delay and rate value flooded. Globally there many analysis for estimating cost and time delay with analytical, case study and downside that are the factors inflicting time delay and rate value flooded which are found by using Rankin’s constant techniques, Risk performance technique, Time delay and cost overrun index, CPM & PERTS, Monte’s Carlo Simulation Techniques, Budget dominant and change and Milestone chart etc are such type of methodologies applies to seek out project’s time delay and cost overrun in Infrastructure project. This paper the methodology accustomed ascertain expected time and cost in Mumbai underground metro rail passageway (MUMRP) by victimization application of Monte’s Carlo Simulation Techniques (MCST), during this we have a tendency to use network flow chart for locating out trial and error based mostly to create activities as essential path technique (EPT) by given downside statement and also outcome in terms of results and conclusion.
Files
J09650641020.pdf
Files
(1.1 MB)
Name | Size | Download all |
---|---|---|
md5:ef3c986b5da1f5e84e896a4fe7f2ddff
|
1.1 MB | Preview Download |
Additional details
Related works
- Is cited by
- Journal article: 2394-0913 (ISSN)
Subjects
- ISSN
- 2394-0913
- Retrieval Number
- J09650641020/2020©BEIESP