Published July 31, 2021 | Version 2.0
Project deliverable Open

D6.1 - Piloting Scenarios & Evaluation Plan II

Description

This document provides an overall guidance methodology for the pilot execution in the first iteration of TheFSM pilots. It sets out the whole process of developing and conducting a pilot and provides for each step a guidance on how to execute these activities.

A pilot consists of the following different steps: i) creation of a pilot plan, including a Data Management Handling Plan (DMHP), ii) preparation of the pilot, iii) deployment and testing of the pilot, iv) evaluation of the pilot results, v) making adaptations to the product tested in the pilot, vi) piloting the new revised product and vii) finalisation of the product.

For all TheFSM applications (i.e., FOODAKAI 2.0, Agrivi 2.0, and FOOD INSPECTOR), each of these steps is described in detail including materials that are needed and made specific for the applications to be tested in the pilots. In addition, for each pilot and application a local DMHP is developed. An outline for such a DMHP is provided and it describes how relevant data during the pilot should be collected, processed or generated, how it should be curated and preserved, etc. Finally, some supplementary materials are provided in the appendix

Files

D6.1 Piloting Scenarios Evaluation Plan_V2_M18.pdf

Files (993.1 kB)

Additional details

Funding

European Commission
TheFSM – The Food Safety Market: an SME-powered industrial data platform to boost the competitiveness of European food certification 871703