Info: Zenodo’s user support line is staffed on regular business days between Dec 23 and Jan 5. Response times may be slightly longer than normal.

Published April 25, 2012 | Version v1
Project deliverable Open

UMBRELLA Deliverable D 1.1 “iTesla Cooperation”

Description

This deliverable contains a questionnaire for TSOs in order to determine the details for information exchange required for both projects.

Files

D1.1-_iTesla_Cooperation.pdf

Files (426.6 kB)

Name Size Download all
md5:d12bfedbf2413b1ee07d990cef2f4ac0
426.6 kB Preview Download

Additional details

Funding

UMBRELLA – Toolbox for Common Forecasting, Risk assessment, and Operational Optimisation in Grid Security Cooperations of Transmission System Operators (TSOs) 282775
European Commission