Info: Zenodo’s user support line is staffed on regular business days between Dec 23 and Jan 5. Response times may be slightly longer than normal.

Published March 5, 2016 | Version v1
Journal article Open

OPTIMIZING THE PERFORMANCE OF THERMAL POWER PLANTS

Description

Failure of boiler tubes has been a familiar phenomenon in power plants resulting in unscheduled plant shut down; in consequence, there are heavy losses in industrial production. The failure of boiler tubes appears in the form of bending, bulging, cracking, wearing or rupture, causing leakage of the tubes. The failure can be caused by one or more modes such as overheating, stress corrosion cracking (SCC), hydrogen embrittlement, creep, flame impingement, sulfide attack, weld attack, ash erosion, dew point corrosion, etc. Failure of tubes in Thermal power plant which is a main contributor to power generation plays a major role in forced outage. In India the Ash percentage in coal is very high i.e 40 –45% which is a major contributor in boiler tube failure in thermal power plants. In this paper, outage optimization is done through minimization of ash erosion by the use of coal

Files

36.pdf

Files (318.2 kB)

Name Size Download all
md5:7a7bc80e14800319d2f801aa36d4f46c
318.2 kB Preview Download