Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published June 30, 2019 | Version v1
Report Open

Case study reports on constructive findings on the prerequisites of successful big data implementation in the transport sector

Description

The deliverable presents seven reports of the case studies conducted in Work Package 3 during Task 3.2. The case studies conducted include:
• Case study 1 “Railway transport”
• Case study 2 “Open data and the transport sector”
• Case study 3 “Real-time traffic management”
• Case study 4 “Logistics and consumer preferences”
• Case study 5 “Smart inland shipping”
• Case study 6 “Optimised transport & improved customer service”
• Case study 7 “Big data and intelligent transport systems”

Files

D3.2_Consolidated case study findings_LeMO.pdf

Files (5.3 MB)

Name Size Download all
md5:5c7ef2fed7222f6434dade111fb3674f
5.3 MB Preview Download