Planned intervention: On Wednesday June 26th 05:30 UTC Zenodo will be unavailable for 10-20 minutes to perform a storage cluster upgrade.
Published September 25, 2020 | Version v1
Report Open

Updated KPIs for electrolysers performing grid services

Description

This report investigates the performance indicators for electrolysers performing grid services as defined in the testing protocols and derived from the economic analysis in the project QualyGridS. It selects the three primary performance indicators that determine if or if not an electrolyser can do the most relevant electricity grid services. It then compares these primary performance indicators to the KPIs defined by FCH-JU in their MAWP and makes a link between the primary performance indicators for grid services and the FCH-JU KPIs. Target numbers for the primary performance indicators are given and primary performance indicators that cannot be derived from the FCH-JU KIPs are identified.

Files

D2_2_KPIs_20200925for_public.pdf

Files (325.3 kB)

Name Size Download all
md5:6c8bfb053e78a37f7fcb8b1cdb20ed03
325.3 kB Preview Download

Additional details

Funding

QualyGridS – Standardized Qualifying tests of electrolysers for grid services 735485
European Commission