Risk and Its Impact on Quality, Safety and Procurement in Construction Projects
Creators
- 1. M.E. Scholar, Infrastructure Engineering and Management, Department of Civil Engineering, Thiagarajar College of Engineering, Madurai, Tamil Nadu, India.
- 2. Professor, Department of Civil Engineering, Thiagarajar College of Engineering, Madurai, Tamil Nadu, India.
- 3. Senior General Manager, Cost Audit, Bangalore, Karnataka, India.
Description
Risk management is an integral part of project management on all construction projects based on knowledge areas of PMBOK. Risk analysis is process of risk which is used to quantify and analyze risks and give the mitigation strategies for each risk. This research was conducted to identify, analyze risks and provide mitigation measures associated with Residential Projects in Bangalore. In this study, risk and its impact were identified and analyzed based on quality, safety and procurement of materials using the questionnaire survey. The impact of project risk was analyzed using qualitative risk analysis like probability of occurrence and impact of each risk based on quality, safety and procurement was found out. Separate risk heat mapping was also created and finally a risk register with risk mitigation measures was provided for impact of risk related to quality, safety, and procurement. Thus, risk management is the best tool for organization to minimize the losses and maximize the benefits in terms of safety, quality and procurement.
Files
Risk and Its Impact on Quality - Formated Paper.pdf
Files
(562.6 kB)
Name | Size | Download all |
---|---|---|
md5:f34274c0a55cda2e3237c06581469856
|
562.6 kB | Preview Download |
Additional details
References
- Senouci, A., Al-Abbadi, I., & Eldin, N. (2015). Safety improvement on building construction sites in Qatar. Procedia Engineering, 123, 504-509.
- Darshan, E., Kumar C J, Rajeeva S J, Narayana G. (2017). Analysis of Risk Management in Residential Building Using Primavera Web Software. International Journal of Advance Research and Innovative Ideas in Education, 3(4).
- ISO 31000:2018, Risk management – guidelines, www.pecb.com
- Osman, M. M., Issa, U. H., & Eraqi, A. M. Z. Identifying the Risk Impact on Cost and Time of the Egyptian Non-Residential Buildings Projects.
- Szymański, P. (2017). Risk management in construction projects. Procedia Engineering, 208, 174-182.
- Risk Management Principles and Guidelines, Bureau of Indian standards, 2011.
- Husin, S., Abdullah, A., Riza, M., & Afifuddin, M. (2018). Risk assessment of resources factor in affecting project time. Advances in Civil Engineering, 2018.
- Zeng, S. X., Tam, C. M., & Tam, V. W. (2010). Integrating safety, environmental and quality risks for project management using a FMEA method. Engineering Economics, 66(1).
- Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk management framework for construction projects in developing countries. Construction management and economics, 22(3), 237-252.