D2.4 Initial pilot test and validation
Creators
- Rodolphe Legouable1
- Anne Marrec1
- Sofiane Imadali1
- Emmanuel Gouleau1
- Malika Djabali1
- Catalin Brezeanu2
- Jaime Garcia-Reinoso3
- Pablo Serrano3
- Winnie Nakimuli3
- Silvia Canale4
- Graziano Ciucciarelli4
- Gerardo Corsaletti4
- Vincenzo Suraci4
- Albino Penna5
- Gabriel Petersen5
- Marco Tognaccini5
- Elian Kraja6
- Gino Carrozzo6
- Leonardo Agueci6
- Ramón Pérez7
- Antonio Cobos7
- Lourdes María de Pedro8
- Fernando Beltrán9
- Diego San Cristóbal9
- Isaac Quintana9
- Manuel Lorenzo9
- Miguel Ángel Martínez10
- Vincent Audebert11
- Amine Abouliatim12
- Laurent Roullet12
- Emmanouil Paraskevakis13
- Georgios Sextos13
- Claudio Casetti14
- Paolo Giaccone14
- Matteo Pergolesi14
- Cristina Rottondi14
- Andrea Bianco14
- V. Foteinos15
- P. Vlacheas15
- I. Stenos15
- K. Trichias15
- V. Laskaridis15
- E. Giannopoulos15
- I. Dimitriadis15
- P. Dimiropoulou15
- V. Stavroulaki15
- I. Belikaidis15
- A. Georgakopoulos15
- A. Badouna15
- Federico Álvarez, Alberto del Río16
- David Jiménez16
- Javier Serrano16
- Juan Rodríguez17
- Lourdes Luque17
- Luis Miguel Contreras17
- Konstantinos Kravariotis18
- Evangelos Kakkavas18
- Jaime Ruiz19
- Ignacio Benito19
- Ignacio Berberana20
- Neftali Gonzalez20
- Sergio Morant21
- 1. ORANGE SA
- 2. ORANGE Romania SA
- 3. Universidad Carlos III de Madrid
- 4. Applied research to technologies
- 5. FST
- 6. NEXTWORKS S.r.l.
- 7. Telcaria Ideas S.L.
- 8. SEG
- 9. Ericsson España S.A
- 10. YBVR
- 11. Electricité de France
- 12. NOKIA BELL LABS France
- 13. Nokia Solutions and Networks Hellas S.A
- 14. Consorzio Nazionale Interuniversitario per le Telecomunicazioni
- 15. WINGS ICT Solutions
- 16. UPM
- 17. Telefónica Investigación y Desarrollo
- 18. Ericsson Hellas S.A
- 19. NOKIA SPAIN S.A.
- 20. IMDEA
- 21. B-COM
Description
The present deliverable is the Initial report about the first functional tests and 5G end to end facility validation. It provides the overall situation of the E2E facility implementation status corresponding to the project’s MS9 Second release of the 5G end to end facility in M24. Special attention has been paid to the 5G infrastructure performance metrics.
The document also goes through all the 5G EVE pilots providing detailed information about the activities performed in the scope of 5G EVE project since last year, their implementation and integration status in the E2E site facility, and the roadmap for activities in the upcoming months. Although the obvious impact of the COVID19 on the Use Cases and Pilots deployments and executions, mostly related to the activities that needed a physical access to the facilities, the consortium has made a big effort to preserve the original roadmap. This has allowed to reach a good level of integration with the 5G EVE platform and to collect preliminary results on the Use Cases’ services.
The last topic covered by the deliverable describes the methodology that has been implemented to provide support to the pilot Use Cases to carry out the Experimentation flow activities as described in D1.3 - 5G EVE end-to-end facility reference architecture for Vertical industries and core applications [3].
This deliverable should provide future 5G EVE experimenters with all the available information to carry out experimentation within 5G EVE E2E facility, including the Blueprints used to instantiate the experiments of the 5G EVE internal Use Cases and the methodology to go through the integration process.
Files
D2.4 Initial pilot test and validation.pdf
Files
(8.3 MB)
Name | Size | Download all |
---|---|---|
md5:0257809083e22619e7248efbbfc5d06d
|
8.3 MB | Preview Download |