Published June 29, 2020 | Version 1

FCR second test Testing protocol frequency or power profile

  • 1. DLR German Aerospace Center
  • 2. DTU

Description

Data files for performing FCR second test Testing protocol as described in annex B of QualyGridS publication "Finalized testing protocol" DOI: https://doi.org/10.5281/zenodo.3912063. Based on real grid Frequency profile from Fingrid. Files FCR_Secondtest_Frequency_... contain the grid frequency input for the test with each line a frequency value in 0.1 second steps, total duration 4 hours.

File FCR_secondtest:Power… contain the power vs. time profile derived from the grid frequency profile for a range of 0-100% with 0% being the lowest power to be used in the test and 100% the highest power. The file contain the power percentage with each line a percentage value in 0.1 second steps, total duration 4 hours.

Further explanations in QualyGridS publication "Finalized testing protocol"  https://doi.org/10.5281/zenodo.3912063

Files

FCR_secondtest_frequency_4h_D2_4.csv

Files (5.7 MB)

Name Size Download all
md5:bb5e7c75331a92806886418918413c59
1.1 MB Preview Download
md5:bb5e7c75331a92806886418918413c59
1.1 MB Preview Download
md5:d0fe0471d29f969a0ecc06964b6ab783
1.1 MB Download
md5:7a8646e4f6f7f26c3d4d53076df274c9
685.3 kB Preview Download
md5:7a8646e4f6f7f26c3d4d53076df274c9
685.3 kB Preview Download
md5:cead05810cbf1dce31a78b0b6fe5f1d7
1.0 MB Download

Additional details

Related works

Is supplemented by
Dataset: 10.5281/zenodo.3912068 (DOI)

Funding

European Commission
QualyGridS - Standardized Qualifying tests of electrolysers for grid services 735485