Identification of Condition and Status of Nepal's First Hydropower-Pharping Hydropower
Creators
- 1. Assistant Professor, Department of Civil Engineering, Nepal Engineering College, Bhaktapur, Nepal.
Description
As micro hydropower project is a small scale of project which is specially installed in remote hilly and mountainous areas to provide electricity for lighting facility and agro-processing. Pharping Hydropower is the first and foremost built infrastructure in the sector of hydroelectricity in the history of Nepal. The installed capacity of Pharping Hydropower Plant is 500 KW. Attempts were made to study the condition and status of Pharping Hydropower, present condition, generation capacity, and efforts were made to find appropriate management options to keep Pharping Hydropower sustainable. This study provides historical development of Pharping hydropower, conditions and problem associated with development of Pharping hydropower.
Files
Identification of Conditon -HBRP Publication.pdf
Files
(546.3 kB)
Name | Size | Download all |
---|---|---|
md5:83d5dfa2965cd1ee29e407c06cb52c40
|
546.3 kB | Preview Download |
Additional details
References
- R. N. Prajapati and S. Manandhar, Hydropower Engineering, First. Heritage Publishers and Distributors Pvt. Ltd., 2013.
- "Nepal Electricity Authority (NEA), Kathamandu."
- "Pharping Hydropower centenary journal," Pharping Hydropower Centen. J.
- "Annual Report, NEA," 2068.
- D. Adhikari, Hydropower Development in Nepal, NRB Economic Review, 2006
Subjects
- Civil Engineering
- http://hbrppublication.com/journals.html