Design of solution V1.0
Description
This report (deliverable) named D6.1 Design of solution is deliverable of WP6 within InterFlex
H2020 (project co-founded by the European Commission). CEZ Distribuce as WP6 leader aims
to perform demonstrations of innovative smart grid solutions in order to increase DER hosting
capacity, integrate EV charging stations and home energy storage systems more effectively
and thus cover important challenges of European DSOs.
The use cases demonstration is performed under the coordination and management of CEZ
Distribuce. Partners involved in the WP6 are Austrian Institute of Technology (AIT), CEZ
Solarni, Fronius, Schneider Electric and Siemens.
As it is stated in GA in Description of Work (DoW), D6_1 Design of solutions contains detail
design of technical solutions of all WP6 use cases, results of customer’s recruitment, lab
tests results and KPIs definition.
This report describes in detail the design of solutions for WP6 that will be implemented in
next stage of the project and then reported in D6.2 Implementation of solution (deliverable
due date 12/2018).
After the evaluation phase of the project, WP6 results will be reported in D6.3Demonstration
activities results (due date 12/2019). This final deliverable of WP6 will also contain CBA and
SRA of demonstrated
Files
D6.1-Design-of-solutions.pdf
Files
(14.1 MB)
Name | Size | Download all |
---|---|---|
md5:e2387ea89d0653ce657ead2a2598c905
|
14.1 MB | Preview Download |