D2.2 Site facilities planning

  • 1. ORANGE SA
  • 2. WINGS ICT Solutions
  • 3. WINGS ICT Solutionss
  • 4. Ericsson Hellas S.A
  • 5. Nokia Solutions and Networks Hellas S.A
  • 6. Hellenic Telecommunications Organisation S.A
  • 7. B-COM
  • 8. NOKIA BELL LABS France
  • 9. IMDEA
  • 10. Eurecom
  • 11. FSTechnology SpA
  • 12. Ericsson Spain
  • 13. Univ. Carlos III de Madrid
  • 14. Ericsson ITA
  • 15. Telecom Italia
  • 16. Ericsson Italia
  • 17. Ares2T

Description

The present deliverable describes the planning of each site facility deployment at least until April 2019. It also gives some perspectives of updates that will occur after this date. April 2019 has been put at the first objective since it corresponds to the initial access to the site facility for vertical hosting. Attached to this deliverable, we have inserted an Excel file, with one sheet per site facility, giving the dates of availability for each component/equipment that compose the integrated site facility. These components are referred via index number in the Excel sheet, showing their date of availability. Then, in the document, a brief description of each component is done as well as its methodology of implementation, testing and validation. More attention is paid about the site facility integration. Indeed, since some site facilities are composed of several integrated platforms regarding the use case they want to host, each integrated platform is detailed about the components they are composed of, the KPI they plan to achieve and the methodology of integration they plan to apply.
The content of this document is complementary to the 5G EVE deliverable D2.1 [1], which describes more in details the various site facilities. We just refer or take inputs coming from [1] to give information about the site facilities architectures and components that integrate the platforms. Therefore, reading first [1] is a prerequisite to better understand this document.

Files

5g-eve-d2.2-site-facilities-planning.pdf

Files (4.1 MB)

Name Size Download all
md5:095971d1f5ab98ba9919eda8070faab0
4.1 MB Preview Download

Additional details

Funding

5G EVE – 5G European Validation platform for Extensive trials 815074
European Commission