Published October 15, 2019 | Version v1
Project deliverable Open

D3.2 First validation of the METRO-HAUL node architecture and optical solutions

Description

D3.2 reports the first validation of the METRO-HAUL node architecture and the interconnection, transmission and switching optical solutions developed in T3.1-T3.3 in different disaggregated scenarios. The deliverable also includes an early description of the METRO-HAUL node control and management environment and the developed software for controlling all the OIE developed in T3.4.

Files

D3.2 First validation of the METRO-HAUL node architecture and optical solutions.pdf

Additional details

Funding

METRO-HAUL – METRO High bandwidth, 5G Application-aware optical network, with edge storage, compUte and low Latency 761727
European Commission