Published September 8, 2019 | Version v1
Project milestone Open

Coupled Reanalysis of the Arctic Climate (Milestone MS9)

  • 1. Centre national de la récherche scientifique (CNRS)
  • 2. University of Bergen (UiB)

Description

Means of verification of attainment of the milestone:  Two novel climate reanalyses made available to the project for evaluation (WP2), process analysis (WP3) and predictability studies (WP4). Reanalysis data are published on Zenodo in open access at the following links:

The links to the reanalysis and the present report have been circulated to WP2, WP3 and WP4 in Blue-Action on 15 Sept. 2019.

Notes

The Blue-Action project has received funding from the European Union's Horizon 2020 Research and Innovation Programme under Grant Agreement No 727852

Files

MS9-LAST.pdf

Files (286.1 kB)

Name Size Download all
md5:e21037ae06b3048f37d0d40ffc7d308d
286.1 kB Preview Download

Additional details

Funding

Blue-Action – Arctic Impact on Weather and Climate 727852
European Commission