Published October 24, 2018
| Version v1
Report
Open
D2.7 Ops Mode and Test Plan
Creators
- 1. TPZ
- 2. UoG
- 3. CNR
- 4. DLR
- 5. WUR
- 6. TASI
Description
This document describes the operational concept to fulfil the EDEN ISS scientific and technical objectives. It
covers the description of the EDEN ISS system and its operations and all the activities and the plan to have
the EDEN ISS operations scenario and procedures ready for Antarctic operations.
Files
EDEN ISS-DLR-WP2.5- Ops Mode and Test Plan v1.4_with TPZ cover.pdf
Files
(17.7 MB)
Name | Size | Download all |
---|---|---|
md5:5aa95ade23bfcb5352ec74a198af152f
|
17.7 MB | Preview Download |