Published January 30, 2019
| Version v1
Journal article
Open
JOB SHOP SCHEDULING CONSIDERING MAKESPAN, PENALTIES OF MACHINE IDLING, AND JOB OUT OF TIME
Creators
- 1. Department of Industrial Engineering, Engineering College at Alqunfudah, Umm Al-Qura University, Saudi Arabia
Description
In this study, the job shop scheduling problem is analysed with respect to numerous objectives, and a multi-objective model is developed to optimise the makespan, maximum job earliness, maximum job tardiness, maximum machine idle time, total machine idling penalties, total job untimed penalties, and total penalties (multi-objective) using the genetic algorithm.
Files
06_IJRG19_A01_2006.pdf
Files
(404.6 kB)
Name | Size | Download all |
---|---|---|
md5:1ab68c4903e8b19894072ba00767b558
|
404.6 kB | Preview Download |