Published November 29, 2013
| Version Final
Project deliverable
Open
LoCloud D1.5: Requirement analysis
Creators
- 1. DCU
- 2. PSNC
Description
This deliverable is part of LoCloud Work Package 1 (WP1): Planning, preparation and requirements and builds on the work carried out so far by WP1. The document describes the user requirements' technical aspects which have been identified through a series of workshops and surveys carried out during the first 10 months of project work. The aim of the analysis of these technical aspects (e.g. content analysis, metadata schemas, ingestions methods, etc.) is to facilitate the design of the technical infrastructure of the LoCloud project.
Notes
Files
LoCloud_D1.5_Requirement_Analysis.pdf
Files
(911.2 kB)
Name | Size | Download all |
---|---|---|
md5:35fb2954811cca565394fc5f15a88256
|
911.2 kB | Preview Download |