Published December 29, 2017 | Version v1
Project deliverable Open

Deliverable 1.1 Use Case scenarios analysis and 5G requirements

Description

This document focuses on three 5G Smart Energy vertical use case scenarios dealing with smart metering (UC1), predictive maintenance (UC2) and dispatchable demand response (UC3). For each use case actors, scenarios, pre and post-conditions, the flow of actions and application requirements are analysed from the energy, telecom and ICT perspectives. The associated 5G network requirements and KPIs are clearly formulated, setting the foundation for the further stages of the project.

Files

Deliverable_D1.1-compressed.pdf

Files (1.9 MB)

Name Size Download all
md5:d69711c82dc8fd8f26c182f3c0cc1e76
1.9 MB Preview Download

Additional details

Funding

NRG-5 – Enabling Smart Energy as a Service via 5G Mobile Network advances (NRG-5) 762013
European Commission