Published April 22, 2024 | Version v1
Journal article Open

WAYS TO CLEAN WASTEWATER FROM CHROMIUM

Description

The reason for a chromium problem in this process is the (inevitable) chromium content of all available vanadium raw materials. This work concentrated on investigating the efficiency and behaviour of Al and Fe electrodes in the EC treatment of Cr, existing both separately and simultaneously in model solutions. Several parameters were examined, such as initial metal concentration, iron and aluminum electrode combination, applied current and initial pH of the solution for a treatment period of 180 minutes. Heavy metals exhibited faster removal rates at higher concentrations, but lower residual concentrations were obtained at lower initial concentrations.

Files

4.19 Iztleuov G.pdf

Files (173.7 kB)

Name Size Download all
md5:235ad5b2d79dd4db4ced0e4e28a84402
173.7 kB Preview Download