Published October 11, 2017 | Version v1
Conference paper Open

Concept and Possible Application of an Automated Framework to Influence Production Dispatch Based on Supply Chain Events

Description

We present in this paper an automated framework for linking supply chain events to production management. While events in the supply chain are detected using statistical process control, the control loop to production is closed using ideas inspired from run-to-run control. The proposed framework is expected to offer a higher level of flexibility with respect to demand changes. This results in increased on-time delivery for customers. While the semiconductor industry faces the challenge of volatile markets, long cycle times and short product life cycles, systems for demand planning and production management are nowadays often decoupled.
Therefore, the proposed framework will be applied to semiconductor manufacturing to link demand planning with production management.

Notes

The work has been performed in the project Power Semiconductor and Electronics Manufacturing 4.0 (SemI40), under grant agreement No 692466. The project is co-funded by grants from Austria, Germany, Italy, France, Portugal and - Electronic Component Systems for European Leadership Joint Undertaking (ECSEL JU).

Files

IESM 2017.pdf

Files (1.0 MB)

Name Size Download all
md5:45559550a814c3bafa4ff4eaf1232c50
1.0 MB Preview Download

Additional details

Funding

SemI40 – Power Semiconductor and Electronics Manufacturing 4.0 692466
European Commission