Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published July 22, 2016 | Version v1
Report Open

Status Report on Calciner Technology - D8.1

  • 1. IKN GmbH
  • 2. VDZ gGmbH
  • 3. Italcementi S.p.A

Description

This report summarizes the technical basis and state-of-the-art designs of the calciner technology used in the cement industry.

Files

D8.1 CEMCAP Deliverable 8_1_Rev2.pdf

Files (1.0 MB)

Name Size Download all
md5:bc0cf4789596cfd441d3c2d4e4fb4137
1.0 MB Preview Download

Additional details

Funding

CEMCAP – CO2 capture from cement production 641185
European Commission