Published April 19, 2024 | Version v1
Other Open

Environmental impact assessment for large carnivores: a methodological review of the wolf (Canis lupus) monitoring in Portugal

  • 1. BE Bioinsight & Ecoa*
  • 2. Centro de Estudos Ambientais e Marinhos
  • 3. University of St Andrews

Description

The continuous growth of the global human population results in increased use and change of landscapes, with infrastructures like transportation or energy facilities, being a particular risk to large carnivores. Environmental Impact Assessments were established to identify the probable environmental consequences of any new proposed project, find ways to reduce impacts, and provide evidence to inform decision making and mitigation. Portugal has a wolf population of around 300 individuals, designated as an endangered species with full legal protection. They occupy the northern mountainous areas of the country which has also been the focus of new human infrastructures over the last 20 years. Consequently, dozens of wolf monitoring programs have been established to evaluate wolf population status, to identify impacts, and to inform appropriate mitigation or compensation measures. We reviewed Portuguese wolf monitoring programs to answer four key questions: do wolf programs examine adequate biological parameters to meet monitoring objectives? is the study design suitable for measuring impacts? are data collection methods and effort sufficient for the stated inference objectives? and do statistical analyses of the data lead to robust conclusions? Overall, we found a mismatch between the stated aims of wolf monitoring and the results reported, and often neither aligns with the existing national wolf monitoring guidelines. Despite the vast effort expended and the diversity of methods used, data analysis makes almost exclusive use of relative indices or summary statistics, with little consideration of the potential biases that arise through the (imperfect) observational process. This makes comparisons of impacts across space and time difficult and is therefore unlikely to contribute to a general understanding of wolf responses to infrastructure-related disturbance. We recommend the development of standardized monitoring protocols and advocate for the use of statistical methods that account for imperfect detection to guarantee accuracy, reproducibility, and efficacy of the programs.

Notes

Funding provided by: Fundação para a Ciência e Tecnologia
Crossref Funder Registry ID: https://ror.org/00snfqn58
Award Number: 2020.06403.BD

Methods

We reviewed all major wolf monitoring programs developed for environmental impact assessments in Portugal since 2002 (Table S1, Supplementary material). Given that the focus here is on the adequacy of targeted wolf monitoring for delivering conclusions about the effects of infrastructure development, we reviewed only monitoring programs that were specifically designed for wolves and not those concerned with general mammalian assessment.

The starting point was a compilation from the 2019-2021 National Wolf Census (Pimenta et al., 2023), where every wolf monitoring program that occurred between 2014 and 2019 in Portugal was identified. The list was completed with projects that started before 2014 or after 2019 based on personal knowledge, inquires to principal scientific teams, governmental agencies, and EIA consultants. Depending on duration, wolf monitoring programs can produce several, usually annual, reports that are not peer-reviewed and do not appear on standard search engines (e.g., Web of Science or Google Schoolar) but are publicly available from the Portuguese Environmental Agency (APA – www.apambiente.pt). We conducted an online search on APA´s search engine (https://siaia.apambiente.pt/) and identified a total of 30 projects. For each of these projects, we were interested in the first and the last report to identify any methodological changes. If the last report was not present, we reviewed the most recent one. If no report was present, we requested it from the team responsible.

Our investigation centred on characterizing and quantifying four components of wolf monitoring programs that are interlinked and that should be ideally determined by the initial objectives: (1) biological parameters, i.e., what wolf parameters were studied to assess impacts; (2) study design, i.e., what sampling schemes were followed to collect and analyse data; (3) data collection, i.e., which sampling methodology and how much effort was used to collect data; and (4) data analysis, i.e., how data were analysed to estimate relevant parameters and assess impact.

Biological parameters were identified and classified under two categories: occurrence and demography, which broadly correspond to the necessary inputs to assess impacts like exclusion effect and changes in reproductive patterns. Occurrence-related parameters refer to variables used to measure the presence or absence of wolves, whereas demographic parameters refer to variables that intend to measure population-level effects such as abundance, density, survival, or reproduction. We also recorded whether any effort was made to quantify prey population distribution or abundance as recommended in the guidelines.

For study design, we reviewed the sampling design of the project, with specific focus on the spatial and temporal aspect of the study such as total area surveyed, the definition of a sampling site within this region (i.e., resolution), the duration of the study and the number of sampling seasons. The goal here was to determine whether the sampling scheme used was appropriate for assessing infrastructure impacts on wolf distribution or demography, depending on what the focus was.

For data collection, we identified the main data collection methodologies used and the corresponding sampling effort. By far the most frequent method used is sign surveys, and specifically scat surveys, and for these studies we recorded whether genetic identification of species or individuals based on faecal DNA was attempted. We compare how sampling effort varies by the various inference objectives and, as above, assess which, if any, project or data collection approach is most likely to produce evidence of impact.

We divided the Analysis component into two groups: single-year and multi-year analyses. For single-year analysis we identified how monitoring projects used data to make inferences about the state biological parameters of interest and discuss the associated strengths and weaknesses. For multi-year analyses, we recorded how differences or trends were quantified and associated with infrastructure impacts, commenting on the statistical robustness of the analyses used across the projects.

Files

Supplementary_material_v2_WLB-2023-01230.R1.pdf

Files (229.0 kB)

Name Size Download all
md5:76d26affcd2f198fe8ccad00296a4528
229.0 kB Preview Download

Additional details

Related works

Is derived from
10.5061/dryad.t1g1jwt87 (DOI)