Inland Waterborne Transport (IWT) advantages as low-energy and low CO2 emitting transport mode are not fully exploited today due to gaps in the logistics system. Inland container vessels pay 6-8 calls at seaport terminals with long waiting times. More time is lost by sub-optimal navigation on rivers and waiting at bridges and locks. In addition, low load factors of containers and vessels impact the logistics systems with unnecessary high numbers of containers being transported and trips being made.
NOVIMOVE strategy is to “condense” the logistics system by improving container load factors and by reducing waiting times in seaports, by improved river voyage planning and execution, and by facilitating smooth passages through bridges and locks.
NOVIMOVE’s innovations are:
NOVIMOVE technology developments will be demonstrated by virtual simulation, scaled model tests and full-scale demonstrations. NOVIMOVE innovations will impact the quantity of freight moved by IWT along the R-A corridor by 30% with respect to 2010 baseline data.
The NOVIMOVE 21-members consortium combines logistics operators, ports, system developers and research organisations from 4 EU member states and two associate countries. The work plan contains 4 technical Work Packages. The project duration is four years; the funding is 8,9 MIO.