Published February 25, 2023 | Version https://www.theijbmt.com/archive/0944/1141465482.pdf
Journal article Open

The Readiness Identification of PT. XYZ to Produces of Small Caliber Munition 5,56 mm with Analysis of Factors Affecting Production Systems

  • 1. Graduate Student of Defense Industry Study Program, Faculty of Defense Technology, Republic of Indonesia Defense University, Jakarta
  • 2. Lecturer of Defense Industry Study Program, Faculty of Defense Technology, Republic of Indonesia Defense University, Jakarta

Description

PT. XYZ received an order from a small caliber munition (SCM) 5.56 from the Ministry of Defense of the Republic of Indonesia as many as 1.1 billion grains for two years or 550 million grains per year. But to produce a SCM 5.56 every year, PT. XYZ is constrained by a production capacity of only 415.9 million grains SCM 5.56 annually. Based on calculations there is a shortage of 134.1 million SCM 5.56 each year. These constraints are due to the not optimal production system implemented by PT. XYZ so that the productivity of the production system is not optimal. To solve this problem, an internal policy model is needed by improving the special production system of SCM 5.56. It consists of improvements in production line layout, supply chain system, Product Breakdown Structure (PBS) analysis and critical path analysis (CPA). By applying such analysis the resulting production time for 1,000 grains is 132,374 minutes or 2,206 hours. But those results need to be tested by testing the normal distribution statistical hypothesis. It turned out that the test results were PT. XYZ is able to fulfill i

Files

1141465482.pdf

Files (722.8 kB)

Name Size Download all
md5:89607d1346018220657061cbc4e01342
722.8 kB Preview Download

Additional details

References

  • Creswell, W. John & Creswell, J. David. (2018). Research Design, Qualitative, Quantitative and Mixed Methods Approaches, Fifth Edition. SAGE Publication, Inc
  • Tompkins, A., James, Ehite, A., John, Bozer, A., Yavuz, Tanchoco, J.M.A. (2010). Facilities Planning Sixth Edition. John Wiley & Sons, Inc
  • Kozai, Toyoki. (2018). Smart Plant Factory. Springer Nature Singapore Ple Ltd
  • IPQI. (2021). Inhouse Training Supply Chain Management. IPQI Favourite Training
  • Antil, D. Peter, Moore, M. David, Neal, J. Derrick. (2001). IPTs (Integrated Project Teams): the way forward for UK DefenceProcurement. Cranfild Ceres
  • Bishnoi, Nisha. (2018). Critical Path Method (CPM): A Coordinating Tool.Journal of IRJMTS.
  • Soe Hein, Paing, Htike Min, Rhein, 2018. Critical Path Analysis Programming Method Without Network Diagram. Journal of MATEC, Vol. 1 No. 1.
  • PT. XYZ. (2020). Small Caliber Munition 5,56 mm Production System