Faktor-Faktor yang Mempengaruhi Contract Change Order pada Pekerjaan Rehabilitasi Jalan Mataiwoi-Abuki

  • 1. Universitas Sulawesi Tenggara

Description

The research was conducted using descriptive statistical methods, namely by analyzing data and questionnaires to determine the mean and then calculating the value of the Relative Interest Index (IKR). This analytical method will be very useful for identifying the rank of respondents and giving priority to study variables. The results showed that the factors causing CCO were the effect of cost (0.362) with a t count of 0.869. The dominant factors causing Contract Change Order (CCO) that affect cost and time are the contractor factor, then the influence of cost, natural conditions, planning & design, time, and the lowest one is the owner's influence.

Files

240-Article Text-679-2-10-20220629.pdf

Files (842.5 kB)

Name Size Download all
md5:67a6c96442f4b8962bb5f9b5cf338520
842.5 kB Preview Download

Additional details

References

  • Adhar, Lakawa, I., Sufrianto. 2021. Sistem Informasi Geografis Kerusakan Jalan Berbasis Web. Sultra Civil Engineering Journal (SCiEJ), Vol. 2(2), pp: 90-98.
  • Agsarini, I., & Wiguna, I. P. A. 2015. Pengaruh faktor kondisi proyek terhadap kinerja proyek konstruksi. Prosiding Seminar Nasional Manajemen Teknologi XXII, 1991, 1–8.
  • Ariani, V. 2016. Pengaruh Pekerjaan Tambah Kurang Terhadap Kinerja Proyek Kontruksi ( Studi Kasus : Kantor Bupati Kabupaten Lima Puluh Kota ). 06(01), 53–69.
  • Dikdik, M.N.S. 2018. Faktor Penyebab dan Dampak Change Order Pada Proyek Konstruksi Bangunan Air.