Published March 31, 2022
| Version v1
Project deliverable
Open
The Floating Structure System
Creators
Description
Deliverable of Workpackage 3 of ATLANTIS describing the design phases and process of the floating structure system that will be implemented in the ATLANTIS Test Centre, in Viana do Castelo.
Files
ATLANTIS D3.1 - Final (Rosto).pdf
Files
(93.7 kB)
Name | Size | Download all |
---|---|---|
md5:0aa752fcb1fdab1422ee33789e339a41
|
93.7 kB | Preview Download |