Published November 16, 2020 | Version v1
Report Open

Evaluation and experiences of full-scale ozonation followed by MBBR post-treatment at Kalundborg wastewater treatment plant. CWPharma project report for GoA3.2: Flexible use of existing infrastructure.

  • 1. Kalundborg Utility and Krüger
  • 2. Kalundborg Utility
  • 1. Berlin Centre of Competence for Water (KWB)
  • 2. Aarhus University (AU)
  • 3. German Environment Agency (UBA)
  • 4. Latvian Institute of Aquatic Ecology (LIAE)
  • 5. Institute of Environmental Protection – National Research Institute (IOS)

Description

Evaluation and experiences of full-scale ozonation followed by MBBR post-treatment at Kalundborg wastewater treatment plant.

GoA3.2: Flexible use of existing infrastructure.

Project report of the CWPharma project (Clear waters from pharmaceuticals) funded by EU’s Interreg Baltic Sea Region Programme

Files

CWPharma_GoA3_2_Report_publ.pdf

Files (8.5 MB)

Name Size Download all
md5:8437ef39cecfd9dd82b28a9cb0d79ffc
8.5 MB Preview Download