There is a newer version of the record available.

Published July 17, 2020 | Version v1
Dataset Open

Result data related to "Tröndle et al (2020) -- Trade-offs between geographic scale, cost, and infrastructure requirements for fully renewable electricity in Europe"

  • 1. IASS Potsdam, ETH Zurich
  • 2. ETH Zurich

Description

The dataset contains aggregated result data of our study. See `README.md` for more information.

 

Files

results-geographic-scale.zip

Files (5.3 MB)

Name Size Download all
md5:b3fc1836635a5a3965ab9033291dd56e
5.3 MB Preview Download

Additional details

Funding

European Commission
TRIPOD - The transition to a renewable electricity system and its interactions with other policy aims 715132