Causes of Change Orders in Construction Projects

  • 1. Civil Engineering Department, Hail University, Saudi Arabia and Fayoum University, Egypt
  • 2. Civil Engineering Department, Prince Mugrin University, Saudi Arabia

Description

Change orders are usually issued to cover variations in the scope of work, material quantities, design errors, and unit rate changes. This study discusses variations in public construction projects in Saudi Arabia by investigating their causes, studying their effects on the project, identifying the beneficial parties, and suggesting remedies to alleviate the related problems. Tasks included conducting a field survey via a questionnaire. It was determined that the top five causes of change orders from contractors’ view are: owner’s additional works, errors, and omissions in design, lack of coordination between construction parties, defective workmanship, and owner financial difficulties.

Files

ETASR_V9_N6_pp4956-4961.pdf

Files (318.2 kB)

Name Size Download all
md5:01723ebbcb8916cd1a1a9c639b326460
318.2 kB Preview Download