D9.1 - Report on pilot preparations and pilot execution plan
Authors/Creators
- Hafize İlhan Özkan1
- Özlem Alpaslan1
- Alperen Erkazancı1
- Hüsamettin Elmas1
- Salih Sandal1
- M. Serdar Yümlü2
- Habib Gültekin2
- Máire Daly3
- Darragh O'Suilleabhain3
- Elaine Walsh3
- Anthony O'Reilly3
- Rebecca Beeckman4
- Ronny Van Looveren4
- Konstantinos Doudouliakis5
- Georgios Papastergios5
- Manolis Mimilidis5
- Apostolos Kelessis5
- Paraskevi Tzoumaka5
- Christantonis Charistes5
- Vasilis Kontos5
- Eleni Giannakidou5
- Spiros Nikolopoulos6
- Yiannis Pragidis7
- 1. Antalya, Municipality
- 2. Sampas
- 3. Cork, Municipality
- 4. Antwerp, Municipality
- 5. Thessaloniki, Municipality
- 6. CERTH
- 7. DUTH
Description
This report acts as a guideline for all activities related to the preparation and execution of CUTLER pilots. For each pilot city, we first briefly describe the pilot scenario, policy making challenges and the expected benefits from the use of the CUTLER platform. In Thessaloniki, the CUTLER platform will be used to plan, implement, monitor and evaluate the use of a new controlled parking system. In Antalya, CUTLER will be used to improve the touristic capabilities of the area surrounding Düden Brook Waterfalls by evaluating concrete measures and actions for accessibility, water usage, environmental protection and mobility. In Antwerp, the platform will be used to monitor and evaluate the Strategic Urban Waterplan of the city and the implementation of green streets and even steer new urban developments. Finally, Cork County Council will utilize the platform to facilitate evidence-based decisions for the touristic exploitation of Camden Fort Meagher, focusing on future access points (by land and sea), facilities (i.e. car parking) and access mechanisms (i.e. modes of transport) in the pilot area.
Moreover, for each city pilot, we discuss the expected use of the CUTLER platform and its impact to policy making, as well as summarize the pilot preparation activities. Preparation activities include: a) definition of all stakeholders to be involved in the pilot implementation, their roles and responsibilities and their level of involvement; b) co-creation activities; and c) data collection activities. We also discuss in details identified risks for pilot implementation and envisaged mitigation measures.
Files
CUTLER_D9.1_final.pdf
Files
(4.2 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:60070dfa60ac5166addb93b85aa6c3f4
|
4.2 MB | Preview Download |