Published November 14, 2026 | Version v1

Surface-Detector Energy Reconstruction at Auger: From S(1000) to Primary Energy

Description

This paper computes a shower-development budget for the Pierre Auger Observatory surface detector array, using published observations as inputs and standard relations stated in full. The principal computed quantities are: S38 VEM 10, energy eV 2.013e+18; S38 VEM 30, energy eV 6.206e+18; S38 VEM 100, energy eV 2.132e+19; S38 VEM 300, energy eV 6.574e+19; S38 VEM 1000, energy eV 2.258e+20; energy at S38 100 eV = 2.132e+19. Each value is derived in the deposited code from the stated inputs, so the budget can be re-run with alternative published values. The results place this measurement quantitatively alongside other observatories and energy ranges treated with the same relations, and the discussion identifies which input dominates the uncertainty of each headline number. Computed from stated assumptions and published data, not a new measurement.

Files

paper.md

Files (34.8 kB)

Name Size
md5:95c15327a37f435cb64c3042279d9a9a
1.0 kB Download
md5:f5b1c5e73ca38d7dbfc9b33fd7ef5d64
17.0 kB Preview Download
md5:571769e15ad0c3d918315a781110334e
16.1 kB Preview Download
md5:02580633b83d6d7aae97a9898b9f3fdb
705 Bytes Preview Download