Instances for Multi-Objective Shipbuilding Block Assembly Scheduling: Parameter Tuning, Algorithm Comparison, and Operator Anlysis
Authors/Creators
Description
This dataset contains the benchmark instances used in Optimization of Production Planning and Resource Coordination Balance for Ship Block and Grand Block Construction
for multi-objective scheduling of shipbuilding block assembly (medium-term
production planning).
Each instance is composed of 12 Excel (.xlsx) tables describing:
1) ship dimensions; 2) line plan; 3) block information;
4) grand blcok information; 5) grand block-block relationships; 6) grand block erection
network; 7) berth information; 8) initial berth occupancy;9) block yard information — reserved for future use; 10) initial block yard occupancy — reserved for future use;11) assembly site information;
12) initial assembly site occupancy.
The dataset is organized into three folders:
- Instances of parameter tuning: 3 instances (A20-G35-R10, A40-G35-R20,
A80-G25-R20) used to tune the inertia weight w.
- Instances of experimental comparison: 9 instances of different scales used
to compare the proposed algorithm against baseline algorithms.
- Instances of operator analysis: 4 instances (case01-case04) used in the
ablation study of solution operators.
File format: Microsoft Excel (.xlsx).