Published November 9, 2026 | Version v1

Excavator drum cutters in tunnels: DEM benchmark, resolution audit, load models and rock-strength observer – data and code

Authors/Creators

  • 1. ROR icon Le Quy Don Technical University

Description

Data and code for the article "Excavator drum cutters in tunnels: load models, excavation rate and rock-strength estimation from a resolution-audited DEM benchmark" (V.H. Nguyen, V.H. Trinh; submitted to Tunnelling and Underground Space Technology).

The dataset contains bonded-particle discrete element (DEM) simulations of a transverse drum cutter with 105 conical picks (tip radius 0.233 m, 90 rpm) mounted on a 20 t hydraulic excavator. The simulations were run in EDEM 2026.1 with 12 mm particles and the Bonding V2 model, in rock of 13–47 MPa uniaxial compressive strength.

Contents:
- 39 full-drum benchmark runs: 27 steady training runs over depth of cut (12–45 mm), feed speed (15–50 mm/s), strength and face inclination; 3 runs at held-out strengths; 9 transient tunnel manoeuvres (plunging, withdrawal, faster feed, speed sag, mixed faces, boom oscillation, re-cutting, oblique feed).
- 13 additional runs: 8 replicates with the particle assembly shifted, 3 mirrored replicates, and 2 runs in a larger rock block.
- Resolution audit:
  - 20 single-pick linear cuts with particle diameters of 12, 8, 4, 2 and 1 mm at depths of 2, 4 and 8 mm;
  - 3 full-drum runs repeated with 8 mm particles;
  - virtual compression tests of the rescaled assemblies.
- Drum force and torque records at 5 ms intervals, drum kinematics, pick tip coordinates, run definitions and calibration results.
- Derived data: detached versus nominal excavated volume of the steady runs.
- Linear-cutting forces digitised from Wang, Wang and Su (2018), doi:10.30797/madencilik.422814.
- Python code that reproduces every number, table and figure of the article:
  - data extraction;
  - power-law, chip-geometry and pick-resolved load models;
  - gradient-boosted residual models;
  - Kalman rock-strength observer;
  - evaluation;
  - excavation-rate chart.

See README.md for file formats and the order in which to run the scripts.

Licences: data under CC BY 4.0, code under the MIT License.

Files

zenodo_bai3_TUST_v8.zip

Files (6.2 MB)

Name Size
md5:cfb10c69c3e676e3b91d4a08c80862f8
6.2 MB Preview Download