Published October 30, 2026 | Version v1

Point cloud processing methodology for monitoring NATM tunnel excavation progress in BIM workflows

  • 1. Vértice Academy

Description

This professional case study presents a point-cloud processing methodology that supports the monitoring of NATM tunnel execution through geometric conformity assessment within a BIM-oriented workflow. Rather than quantifying construction progress as physical advance or percentage of completion, the method focuses on recurring assessment of the executed geometry against as-designed references. The empirical basis comprises twelve recurring overbreak analysis cycles, with 81 localized records, and six complementary underbreak/intrusion inspection campaigns carried out in 2026. The workflow combines campaign traceability, preliminary spatial validation, controlled point-cloud preparation, comparison with project references, signed-distance inspection, cross-section extraction and, when geometric conditions allow, three-dimensional surface reconstruction for volumetric analysis. The application generated complementary products including deviation maps, localized geometric and volumetric records, and comparative cross-sections, while preserving the link between each measurement, its campaign, and the corresponding as-designed geometry. The case indicates that the value of Scan-vs-BIM in NATM construction lies not only in three-dimensional visualization, but in structuring captured geometry as traceable operational evidence that can support BIM coordination, geometric control, and engineering reporting.

Files

anais-9-a-era-bim-2026-artigo-23823138.pdf

Files (1.4 MB)

Name Size
md5:4643a4ef54f2cd96be7738d393ef17a1
1.4 MB Preview Download

Additional details

Additional titles

Translated title
Metodologia de processamento de nuvens de pontos para acompanhamento do progresso de execução de túneis NATM em fluxos BIM