HBIM project contracting and the advantages of scan-to-BIM: a case study of a public terms of reference
Description
Public administration still faces challenges in defining technical requirements that ensure the quality of information produced in BIM-based projects. This study aimed to analyze a reference public procurement document for contracting heritage restoration projects, seeking to understand how structuring technical requirements contributes to delivering more reliable outputs. The research is characterized as a qualitative case study based on document analysis of the procurement and associated documents. The results reveal the adoption of specific requirements defined according to the intended uses of the model, including laser scanning, HBIM modeling, interoperability, information management, collaborative coordination, and cost estimation. As a practical contribution, the study systematizes recommendations for developing more technically structured terms of reference for the procurement of Scan-to-BIM/HBIM services, aiming to support improvements in public procurement processes related to the preservation of historical heritage.
Files
anais-9-a-era-bim-2026-artigo-23822965.pdf
Additional details
Additional titles
- Translated title
- A contratação do projeto HBIM e as vantagens do scan-to-BIM: estudo de caso de um termo de referência público