Published October 24, 2026 | Version v1

ПОСТРОЕНИЕ СИСТЕМЫ УПРАВЛЕНИЯ ПОМОЛЬНЫМ УЧАСТКОМ ЗЕРНА НА ОСНОВЕ ДЕТЕРМИНИРОВАННЫХ МОДЕЛЕЙ

Description

The main drawback of the existing mill management system is the mismatch between the production rate and the receipt of information on its performance. Such a delay, time inconsistencies lead to the depreciation of information on the operation of technological plants, does not make it possible to timely determine deviations from operational plans in the process of their implementation, to identify the causes of these deviations, to open internal production reserves, and to take effective measures for their rational use. Elimination of the mentioned drawbacks in process control is proposed on the basis of deterministic mathematical models created at the upper levels of integrated mill control systems.

Files

1 (89).pdf

Files (542.6 kB)

Name Size
md5:90fdbe69b278b04d82dcbeef3d34932c
542.6 kB Preview Download