Published January 5, 2017
| Version v1
Journal article
Open
WATER MANAGEMENT OF CONSTRUCTION SITE
Authors/Creators
Description
At prior stage water management is not considered to be vital point of planning and supervision as well, as the time passes all the possible chances of water entry in the structured is observed. As a result it seems very worst stage of existing building. Here entry of water may be from underground source, due to wrong workmanship or entry of water from surface source. Final result will be in the form of structurally weak building. For underground water entry there are number of chances of corrosion of steel in footing portion
Files
Files
(1.0 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:7b926c4c08d9cf7d2553a3cf03565c28
|
1.0 MB | Download |