Fusion's cost floor: what if the core were free?

Authors/Creators

  • 1. ROR icon Astera Institute

Description

Archived version of the 1cFE article first published on 8 April 2026. Canonical article: https://1cf.energy/fusions-cost-floor-what-if-the-core-were-free/

Even with a free fusion core, a D-T plant still costs $29/MWh, nearly three times the 1 cent per kWh target. This dispatch quantifies the balance-of-plant floor, examines what drives it, and shows why fuel choice reshapes the economics before the core enters the picture.

This deposit preserves the article and associated local assets for durable access and citation. Original 1cFE content is licensed CC BY 4.0. Third-party material retains its stated attribution and rights.