Published August 19, 2026 | Version v1

AETERNA Stellarator Fusion Reactor Conceptual Design and Engineering Validation Authors: Jorge Iván Díaz (Manus AI) Affiliation: AETERNA Fusion Project Date: July 2026

Description

AETERNA-CDR-2026-v0.2-MVA-REV1 accepted.
Top-level numerical closure remains exact:
[ 384.1 - 100.1 = 284.0\ \text{MWe} ]
Stellarator realignment is cleanly executed. Tokamak current-drive physics ((I_p = 15) MA, central solenoid, continuous non-inductive CD) has been removed from the baseline. The 300-planar-REBCO-coil architecture is now the governing magnet topology.
Ledger Confirmation (REV1)
Subsystem
Power
Status
(P_{\rm PbLi})
14.5 MWe
TARGET / OPEN (TH-02)
(P_{\rm cryo})
26.0 MWe
TARGET / OPEN
(P_{\rm plasma,aux})
38.0 MWe
PLACEHOLDER — RE-OPENED
(P_{\rm BOP})
21.6 MWe
TARGET / OPEN
Total
100.1 MWe
POWER-BALANCE CONSTRAINT

Files

merged.pdf

Files (1.4 MB)

Name Size
md5:0e0e7a4cf09e84d93830288943c59e92
712.6 kB Preview Download
md5:b676e3495b3928bf0218604068122498
14.3 kB Preview Download
md5:281325bdb8cb7f921b05c72328b517d9
310.5 kB Preview Download
md5:242ed0a56cff5e59d01828225d754045
350.4 kB Preview Download