Published July 26, 2026 | Version 1.0

Post-Work Requires Power: Saved Hours, Human Activity and the Allocation of Future Electricity

Authors/Creators

  • 1. Hedegreen Research

Description

Automation is usually framed as either an electricity cost or an efficiency gain. This working paper argues that both framings omit a critical planning term: the electricity and broader energy-system access required to support the human activity made possible when compulsory work is reduced.

It identifies a dual expansion mechanism in which cheaper machine intelligence may increase machine-side electricity demand while released human time may increase human-side activity and energy use. The paper introduces Human Energy Allocation as a planning lens and uses Japan as its first field edition because the country’s FY2026–FY2035 electricity forecast explicitly identifies data-centre and semiconductor demand.

The historical analysis finds no reliable fixed electricity–freedom breakpoint across the preferred cross-sections. The paper therefore reaches a narrow normative conclusion: current constrained demand should not be treated as either a planning target or a moral ceiling.

Files

post-work-requires-power-japan-v1.0-working-paper.pdf

Files (306.7 kB)

Additional details

Related works

Is supplement to
Working paper: 10.5281/zenodo.20400880 (DOI)