Published July 21, 2026
| Version v1
Dataset
Open
Supplementary Data for the publication "Impact of Hydrogen Blending Constraints on Electrolyser Operation and Hydrogen Production Costs: A Case Study of a Regional Gas Grid Section in Austria"
Authors/Creators
Description
The data provided is part of the publication Impact of Hydrogen Blending Constraints on Electrolyser Operation and Hydrogen Production Costs: A Case Study of a Regional Gas Grid Section in Austria
The data contains simulation inputs and results for dynamic gas grid simulations with DynANA as well as results of the dispatch optimisation with IESopt
DynANA simulation inputs and outputs
- Model topology (pipes, nodes)
- Nodal timeseries of gas demand
- Timeseries of H2 injection profile for upstream electrolyser
- Nodal timeserie of pressure and hydrogen concentration
IESopt optimization results
Data for upstream electrolyser and downstream electrolyser (three electricty price years and three injection constraint cases)
- Timeseries of electrolyser operation, grid feed-in and trailer filling
Files
DynANA_input_output.zip
Files
(24.1 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:c977d54462ba62c27bdc0d835bdc6db0
|
10.9 MB | Preview Download |
|
md5:92be847308c465b5c1a67aa13c024464
|
4.1 MB | Preview Download |
|
md5:b8e52d8f9e383241f8d31c309f445281
|
3.9 MB | Preview Download |
|
md5:209a1964f52a383531a7bfee3ad2201f
|
4.0 MB | Preview Download |
|
md5:1fcb74e4e88a63a77e272248d6ce043f
|
1.2 MB | Preview Download |
Additional details
Funding
- Climate and Energy Fund
- The conducted work is part of the "H2REAL" project which is supported with the funds from the Climate and Energy Fund and implemented in the framework of the RTI-initiative "Flagship Region Energy"
Dates
- Available
-
2026