Published July 17, 2026
| Version 1.0
Dataset
Open
Dataset for: Degradation-aware tri-objective optimisation of gigawatt-scale PEM green hydrogen production: the hidden cost of ignoring stack degradation
Authors/Creators
Description
Results data supporting the associated manuscript (under peer review): (1) canonical Pareto-optimal design vectors from the tri-objective NSGA-III optimisation of a gigawatt-scale PEM green hydrogen facility at NEOM, Saudi Arabia; (2) the twenty-run statistical reproducibility campaign; (3) inter-annual resource robustness evaluations across eighteen NSRDB solar years (2005–2022) and twenty-one ERA5 wind years (2004–2024); (4) sequential 25-year degradation rollout trajectories for the four canonical designs. See README.md for full column dictionaries. The simulation model and optimisation code are available from the corresponding author on reasonable request.
Files
01_canonical_designs.csv
Files
(32.3 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:ba22a6e92cb5cc2a04b89961052db4ab
|
1.2 kB | Preview Download |
|
md5:98b91bac48fd749348ada7600e1743f3
|
3.0 kB | Preview Download |
|
md5:4280ae844b4dec10dbd683118ddf629e
|
4.7 kB | Preview Download |
|
md5:853b3a1ecb2f335fd5a4fbcff039def2
|
7.1 kB | Preview Download |
|
md5:36ea7c5a93cac392839cf9f42cd08aa6
|
597 Bytes | Preview Download |
|
md5:e0e575ad1052f5cb1cb2b024f9aa8fd1
|
2.1 kB | Preview Download |
|
md5:3345293897a6a2f33947ce0cb77a0618
|
2.1 kB | Preview Download |
|
md5:1d35f9e051cc75c4bbcf829a2c744b44
|
2.1 kB | Preview Download |
|
md5:2dc8d091828da3bb0b2f0cf185cb24ac
|
2.1 kB | Preview Download |
|
md5:4b47780eefa2cdcd622199969498c41b
|
6.4 kB | Preview Download |
|
md5:b4e2a12d0036495704e14324436e7652
|
940 Bytes | Preview Download |