Published April 28, 2026 | Version v1
Journal article Open

Digital Twin Frameworks for Predictive Risk Management in ERP Transformations

  • 1. Pondicherry University, India.

Description

ERP transformations are among the most complex and failure-prone enterprise transformations in modern enterprise life. They consistently show patterns of investment overruns, schedule slippages, and scope shortfalls that earlier risk management frameworks have not been able to manage. The Digital Twin for ERP Transformation framework combines system-of-systems modeling, streaming telemetry, and machine learning-based predictive risk analytics with existing project risk management methodologies to create a dynamic computationally synchronized digital twin of the transformation's risk profile. Guided by ISO 23247 digital twin architecture, NIST AI RMF governance function, and PMBOK risk management processes, operationalize a four-layer digital twin reference architecture of observable program components, integration and telemetry, twin core models, and decision applications. Engineered leading indicators, including change-request entropy, defect acceleration index, backlog flow efficiency, and migration yield, are fed to machine learning classifiers and Monte Carlo simulation engines. This replaces milestone plans with honest, continuously updated uncertainty distributions, which are used to predict probabilistic schedule and cost risk curves. Pathway-specific calibration for greenfield, brownfield, and hybrid ERP migration strategies requires different risk profiles and governance requirements. A system of explainability, bias testing, and human-in-the-loop accountability structures for AI systems to meet AI trustworthiness principles is used to achieve governance obligations. The resulting program risk management framework changes the model of status reporting from after-the-fact to continuous, predictive, actionable intelligence for low-cost intervention before risk materializes, considerably lowering the risk of program failure in complex multi-phase ERP transformation projects.

Files

JISEM-3810-2026.pdf

Files (226.0 kB)

Name Size Download all
md5:8ff3256469b6ea4319eb972de6efe897
226.0 kB Preview Download