Published March 29, 2026 | Version v1

PREDICTIVE MAINTENANCE OF POWER TRANSFORMER USING MACHINE LEARNING - A CASE STUDY

  • 1. UNIVERSITY OF MINES AND TECHNOLOGY (UMaT), TARKWA, FACULTY OF ENGINEERING, DEPARTMENT OF ELECTRICAL AND ELECTRONIC ENGINEERING
  • 2. FACULTY OF ENGINEERING

Description

The importance of power transformers in electrical power systems cannot be overstated, as their failures can lead to considerable economic losses and disruptions. The typical malfunctions encountered by a power transformer comprise dielectric issues, thermal losses due to copper resistance, distortions in winding caused by mechanical faults, failure of bushings, malfunction of tap changers, core malfunction, tank malfunction, failure of the protection system, and failure of the cooling system. Traditional methods for transformer fault detection involve using the ratio of key gases present in the transformer oil when a fault occurs. These gases include Hydrogen (H2), Methane (CH4), Ethane (C2H6), Ethylene (C2H4), Ethyne (C 2H2), Carbon Monoxide (CO) and Carbon Dioxide (CO2). For accurate and early detection of faults, traditional methods require complex algorithms. This project focuses on the predictive maintenance of power transformers using machine learning techniques, aiming to identify and address potential faults pre-emptively. By analysing various fault types and leveraging machine learning tech like Decision Trees, Support Vector Machines (SVM), and K-Nearest Neighbour (KNN), the project develops models that predict transformer failures based on historical data. Dataspell software and Python libraries such as Numpy and Matplotlib were used to train the model. The testing results showed the efficiency of the SVM, KNN, and Decision Tree methods in detecting the faults experienced by the power transformer. The testing accuracy for SVM, KNN and Decision Tree models was 95.65%, 95.65% and 89.13%, respectively. It was observed that the SVM and KNN models performed better than the decision tree model.

Files

paper_69c96f8d372c38.04105695_AMANING_RICHMOND_OFORI_FINAL_PROJECT-1.pdf

Files (1.5 MB)

Name Size Download all
md5:5609b5e243d1d1e9635d674501d6937f
42.7 kB Download
md5:07afb550b112f6cd16454ef8b30f2f85
847.6 kB Preview Download
md5:b638602162da4e71a85c7715441cc6bf
583.4 kB Preview Download

Additional details

Related works

Is identical to
Journal article: https://parj.africa/aje_maintenancee/article/view/28793 (URL)