The Sentinel Papers — Overview — A Constraint Satisfaction Blueprint for the LGM-35A Sentinel ICBM Program
Description
An overview of the seven independent analytical spokes examining whether the LGM-35A Sentinel ICBM program can satisfy its coupled constraints across cost, schedule, construction, NC3 integration, cyber-surety, test adequacy, and workforce simultaneously.
The analysis identifies a bounded feasible path (the Threaded Continuity Regime) requiring six specific actions — including two unfunded programs the Air Force's own assessments identify as necessary — and demonstrates that 2028 is the critical decision point beyond which propellant chemistry forecloses options policy cannot reopen. 63 testable acceptance criteria. Every claim source-verified against primary documents.
Companion website: https://constraintlayer.ai/sentinel-papers/
Files
The Sentinel Papers - Overview - A Constraint Satisfaction Blueprint for the LGM-35A Sentinel ICBM Program.docx.pdf
Files
(3.7 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:45986e2539bf746c1be416751b9afe5b
|
3.7 MB | Preview Download |