Published February 7, 2026 | Version v1
Journal article Open

Framework for Integrating 4D/5D Bim, Scan to Bim, and EVM for Enhanced Delivery Performance

Authors/Creators

Description

Infrastructure projects frequently experience cost overruns and schedule delays due to fragmented design, planning, and cost management practices. This study presents a techno-managerial implementation of 5D Building Information Modeling (BIM) for infrastructure projects by integrating 3D models with time and cost data through a standardized workflow. The proposed framework employs BIM platform as a unified 5D BIM platform for integrating quantities, schedules, costs, and cash flow analysis. Embedding EVM within the model and visualizing results through a Power BI dashboard enabled reliable, real-time performance monitoring. Scan-to-BIM–based progress verification further improved data accuracy, leading to enhanced cost certainty, forecasting reliability, and informed decision-making in infrastructure projects.

Files

MJCEA0701001(1-5).pdf

Files (515.3 kB)

Name Size Download all
md5:5cb8c730250cfd47c8505e41b21f6fdc
515.3 kB Preview Download

Additional details

Dates

Accepted
2026-01-03